{"id":11876,"date":"2025-07-09T10:40:27","date_gmt":"2025-07-09T08:40:27","guid":{"rendered":"https:\/\/www.holzhauer-pumpen.de\/en\/?post_type=projects&#038;p=11876"},"modified":"2026-03-26T14:38:03","modified_gmt":"2026-03-26T13:38:03","slug":"fire-protection-for-energiekuste-lng-terminal","status":"publish","type":"projects","link":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal","title":{"rendered":"Fire protection for Energiek\u00fcste LNG terminal"},"content":{"rendered":"\n<h2 class=\"wp-block-heading wp-embed-aspect-16-9 wp-has-aspect-ratio\">Requirements<\/h2>\n\n\n\n<p class=\"wp-embed-aspect-16-9 wp-has-aspect-ratio\">The LNG terminal in northern Germany is a strategically important infrastructure project for Germany&#8217;s energy supply. As part of the \u201cEnergy Coast\u201d, the terminal is a central hub for feeding liquefied natural gas into the German supply network &#8211; and therefore an important building block for security of supply and energy independence.<\/p>\n\n\n\n<p>The requirements for the fire protection system were as individual as the infrastructure itself. Particularly in the maritime area &#8211; on the seaward side of the terminal &#8211; all components had to withstand extreme conditions: salty air, splash water, high mechanical loads and maximum availability in an emergency. At the same time, high technical and legal requirements applied, such as the 44th BImSchV (Federal Immission Control Act), FM approval or requirements for medium-voltage supply and environmental protection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading wp-embed-aspect-16-9 wp-has-aspect-ratio\">Solution<\/h2>\n\n\n\n<p class=\"wp-embed-aspect-16-9 wp-has-aspect-ratio\">Customized pump systems were supplied for the seaward and landside of the LNG terminal:<br><strong>Seaward side (jetty)<\/strong><\/p>\n\n\n\n<p class=\"wp-embed-aspect-16-9 wp-has-aspect-ratio\"><code>Diesel-powered, seawater-resistant vertical turbine pump (15.5 m long)<\/code><br>Delivery rate: 1,222 m\u00b3\/h at 14.5 bar<br>Largest FM-approved, electronically controlled Tier 3 diesel engine with 1,200 hp<br>Antifouling system against biological deposits<br>Central diesel supply via 6,200 liter tank designed in accordance with WHG (German Water Resources Act)<\/p>\n\n\n\n<p class=\"wp-embed-aspect-16-9 wp-has-aspect-ratio\"><strong>Shore side (pump houses)<\/strong><br><code>2 vertical turbine pumps driven by medium-voltage generators (700 kW)<\/code><br>In addition: 2 diesel high-pressure pumps (pressure maintenance pumps) with pumps also installed vertically<\/p>\n\n\n\n<h2 class=\"wp-block-heading wp-embed-aspect-16-9 wp-has-aspect-ratio\">Project Details<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><div class=\"responsify-table\"><div style=\"display:block;overflow-x:auto;width:100%;-webkit-overflow-scrolling:touch;-ms-overflow-style:-ms-autohiding-scrollbar\"><table  style=\"min-width:100%;\"><tbody><tr><td>Category<\/td><td>Power Plant \/ LNG<\/td><\/tr><tr><td>Duty flow per fire pump<\/td><td>20.000 liters \/ minute<\/td><\/tr><tr><td>Nominal delivery head<\/td><td>117 m<\/td><\/tr><tr><td>Drive power per fire pump<\/td><td>730 kW<\/td><\/tr><tr><td>Drive type<\/td><td>Diesel <\/td><\/tr><tr><td>Design standard<\/td><td>FM \/ NFPA<\/td><\/tr><\/tbody><\/table><\/div><\/div><\/figure>\n\n\n<section class=\"wp-projects w-full py-16\"  id=\"wp-projects-mb-block-cbce95dc-b541-42c0-974d-ebca1e17101e\">\n    \n        <div class=\"w-full max-w-contentWide mx-auto px-6 sm:px-10 xl:px-16 mb-4 flex flex-row flex-wrap\">\n        <div class=\"w-full md:w-3\/4\">\n            <h2 class=\"text-2xl md:text-4xl text-gray-700 font-bold mb-8\">\n                More Reference Projects            <\/h2>\n        <\/div>\n    <\/div>\n        \n    <div class=\"w-full max-w-contentWide mx-auto px-6 sm:px-10 xl:px-16\">\n\n        <div>\n            <div class=\"flex flex-row flex-wrap -mx-4\">\n\t\t\t                        <article class=\"px-4 w-full sm:w-1\/2 md:w-1\/3 mb-8\">\n                                                <a href=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal\" title=\"Fire protection for Energiek\u00fcste LNG terminal\" class=\"shadow-md group hover:shadow-2xl hover:-translate-y-1 transition-all transform duration-700 ease-in-out rounded overflow-hidden bg-white w-full h-full flex flex-col\">\n                            <img decoding=\"async\" src=\"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-768x454.jpg\" class=\"w-full h-auto block\" alt=\"\">\n                            <div class=\"flex flex-col h-full p-4 md:p-6\">\n                                <p class=\"text-xs mb-1 text-gray-600\">Power Plants and Recycling<\/p>\n                                <h3 class=\"text-gray-700 font-bold mb-4 text-lg leading-tight\">\n                                    Fire protection for Energiek\u00fcste LNG terminal                                <\/h3>\n                                                                <p class=\"text-sm\">Requirements The LNG terminal in northern Germany is a strategically important infrastructure project for Germany&#8217;s energy supply. As part of the \u201cEnergy Coast\u201d, the\u2026<\/p>\n                                <p class=\"w-full h-full flex flex-row items-end justify-end mt-4\">\n                                    <span class=\"text-gray-600\">\n                                        <svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"fal\" data-icon=\"long-arrow-right\" class=\"w-6 h-6\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 448 512\"><path fill=\"currentColor\" d=\"M311.03 131.515l-7.071 7.07c-4.686 4.686-4.686 12.284 0 16.971L387.887 239H12c-6.627 0-12 5.373-12 12v10c0 6.627 5.373 12 12 12h375.887l-83.928 83.444c-4.686 4.686-4.686 12.284 0 16.971l7.071 7.07c4.686 4.686 12.284 4.686 16.97 0l116.485-116c4.686-4.686 4.686-12.284 0-16.971L328 131.515c-4.686-4.687-12.284-4.687-16.97 0z\"><\/path><\/svg>\n                                    <\/span>\n                                <\/p>\n                            <\/div>\n                        <\/a>\n                    <\/article>\n\t\t\t                        <article class=\"px-4 w-full sm:w-1\/2 md:w-1\/3 mb-8\">\n                                                <a href=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-the-dismantling-of-the-nuclear-power-plant\" title=\"Fire protection for the dismantling of the nuclear power plant\" class=\"shadow-md group hover:shadow-2xl hover:-translate-y-1 transition-all transform duration-700 ease-in-out rounded overflow-hidden bg-white w-full h-full flex flex-col\">\n                            <img decoding=\"async\" src=\"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/Abholung-1920-1280-750x900-1-750x454.png\" class=\"w-full h-auto block\" alt=\"\">\n                            <div class=\"flex flex-col h-full p-4 md:p-6\">\n                                <p class=\"text-xs mb-1 text-gray-600\">Power Plants and Recycling<\/p>\n                                <h3 class=\"text-gray-700 font-bold mb-4 text-lg leading-tight\">\n                                    Fire protection for the dismantling of the nuclear power plant                                <\/h3>\n                                                                <p class=\"text-sm\">Requirements Fire protection is a key issue when dismantling nuclear power plants. Our specially developed fire protection unit meets all safety-related requirements and is\u2026<\/p>\n                                <p class=\"w-full h-full flex flex-row items-end justify-end mt-4\">\n                                    <span class=\"text-gray-600\">\n                                        <svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"fal\" data-icon=\"long-arrow-right\" class=\"w-6 h-6\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 448 512\"><path fill=\"currentColor\" d=\"M311.03 131.515l-7.071 7.07c-4.686 4.686-4.686 12.284 0 16.971L387.887 239H12c-6.627 0-12 5.373-12 12v10c0 6.627 5.373 12 12 12h375.887l-83.928 83.444c-4.686 4.686-4.686 12.284 0 16.971l7.071 7.07c4.686 4.686 12.284 4.686 16.97 0l116.485-116c4.686-4.686 4.686-12.284 0-16.971L328 131.515c-4.686-4.687-12.284-4.687-16.97 0z\"><\/path><\/svg>\n                                    <\/span>\n                                <\/p>\n                            <\/div>\n                        <\/a>\n                    <\/article>\n\t\t\t                        <article class=\"px-4 w-full sm:w-1\/2 md:w-1\/3 mb-8\">\n                                                <a href=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/stationary-fire-protection-solution-for-berlin-shopping-center\" title=\"Stationary fire protection solution for Berlin shopping center\" class=\"shadow-md group hover:shadow-2xl hover:-translate-y-1 transition-all transform duration-700 ease-in-out rounded overflow-hidden bg-white w-full h-full flex flex-col\">\n                            <img decoding=\"async\" src=\"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/vlcsnap-2025-06-17-11h03m34s330-768x454.png\" class=\"w-full h-auto block\" alt=\"\">\n                            <div class=\"flex flex-col h-full p-4 md:p-6\">\n                                <p class=\"text-xs mb-1 text-gray-600\">Retail<\/p>\n                                <h3 class=\"text-gray-700 font-bold mb-4 text-lg leading-tight\">\n                                    Stationary fire protection solution for Berlin shopping center                                <\/h3>\n                                                                <p class=\"text-sm\">Requirements Shopping centers place complex demands on stationary fire protection systems. The aim of this project was to plan, manufacture, supply and install a\u2026<\/p>\n                                <p class=\"w-full h-full flex flex-row items-end justify-end mt-4\">\n                                    <span class=\"text-gray-600\">\n                                        <svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"fal\" data-icon=\"long-arrow-right\" class=\"w-6 h-6\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 448 512\"><path fill=\"currentColor\" d=\"M311.03 131.515l-7.071 7.07c-4.686 4.686-4.686 12.284 0 16.971L387.887 239H12c-6.627 0-12 5.373-12 12v10c0 6.627 5.373 12 12 12h375.887l-83.928 83.444c-4.686 4.686-4.686 12.284 0 16.971l7.071 7.07c4.686 4.686 12.284 4.686 16.97 0l116.485-116c4.686-4.686 4.686-12.284 0-16.971L328 131.515c-4.686-4.687-12.284-4.687-16.97 0z\"><\/path><\/svg>\n                                    <\/span>\n                                <\/p>\n                            <\/div>\n                        <\/a>\n                    <\/article>\n\t\t\t                <\/div>\n            <div class=\"w-full text-center mt-8\">\n                <a class=\"uppercase text-gray-600 text-sm text-center font-medium hover:text-black\" href=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\" title=\"Show all posts\">\n\t\t            Show all projects                <\/a>\n            <\/div>\n        <\/div>\n        \n    <\/div>\n<\/section>\n\n\n<section class=\"wp-cta w-full bg-gray-200 py-16 w-full\"  id=\"wp-cta-mb-block-25d3b57d-9679-438b-81e2-adcb124ea02d\">\n\t    <div class=\"max-w-contentSmall w-full mx-auto px-4 sm:px-8 md:px-16 mb-4\">\n        <h2 class=\"text-center text-gray-700 text-3xl font-bold leading-tight\">Let us help you!<\/h2>\n    <\/div>\n\t\t    <div class=\"max-w-contentSmall w-full mx-auto px-8 sm:px-32 md:px-48 mb-8\">\n        <p class=\"text-gray-600 font-light text-center\">Our employees explain and illustrate the requirements of standards and regulations as early as the initial consultation phase and thus facilitate the implementation and safe application in your daily work. In addition, they present engineering expertise spanning 50 years of hands-on application and research and thus provide our customers with a decisive competitive edge.<\/p>\n    <\/div>\n\t        <div class=\"max-w-contentSmall w-full mx-auto px-4 md:px-48\">\n        <p class=\"text-center\">\n            <a class=\"text-sm hover:text-gray-600 font-medium py-3 px-8 rounded-full border-gray-600 border hover:bg-transparent transition-all duration-700 ease-in-out bg-gray-600 text-white leading-none transition-all duration-700 ease-in-out\" href=\"https:\/\/www.holzhauer-pumpen.de\/en\/contact\" title=\"Contact us\" >\n\t            Contact us            <\/a>\n        <\/p>\n    <\/div>\n    <\/section>\n\n\n\n<p class=\"wp-embed-aspect-16-9 wp-has-aspect-ratio\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Requirements The LNG terminal in northern Germany is a strategically important infrastructure project for Germany&#8217;s energy supply. As part of the \u201cEnergy Coast\u201d, the terminal is a central hub for feeding liquefied natural gas into the German supply network &#8211; and therefore an important building block for security of supply and energy independence. The requirements [&hellip;]<\/p>\n","protected":false},"featured_media":11878,"template":"","class_list":["post-11876","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH\" \/>\n<meta property=\"og:description\" content=\"Requirements The LNG terminal in northern Germany is a strategically important infrastructure project for Germany&#8217;s energy supply. As part of the \u201cEnergy Coast\u201d, the terminal is a central hub for feeding liquefied natural gas into the German supply network &#8211; and therefore an important building block for security of supply and energy independence. The requirements [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal\" \/>\n<meta property=\"og:site_name\" content=\"Holzhauer-Pumpen GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/holzhauerpumpen\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T13:38:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-1024x575.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"575\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal\",\"url\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal\",\"name\":\"Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/07\\\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg\",\"datePublished\":\"2025-07-09T08:40:27+00:00\",\"dateModified\":\"2026-03-26T13:38:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal#primaryimage\",\"url\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/07\\\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/07\\\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg\",\"width\":2560,\"height\":1438,\"caption\":\"Aerial view tanker ship unloading at port, Business import export oil with tanker ship transportation oil from refinery on the sea.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/about-us\\\/reference-projects\\\/fire-protection-for-energiekuste-lng-terminal#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Fire protection for Energiek\u00fcste LNG terminal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/\",\"name\":\"Holzhauer-Pumpen GmbH\",\"description\":\"Fire protection. Since 1969.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#organization\",\"name\":\"Holzhauer-Pumpen GmbH\",\"url\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/placeholder.jpg\",\"contentUrl\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/placeholder.jpg\",\"width\":768,\"height\":454,\"caption\":\"Holzhauer-Pumpen GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.holzhauer-pumpen.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/holzhauerpumpen\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/holzhauer-pumpen\\\/mycompany\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC4t3JItgraIywBYYI5Lm7xQ\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal","og_locale":"en_US","og_type":"article","og_title":"Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH","og_description":"Requirements The LNG terminal in northern Germany is a strategically important infrastructure project for Germany&#8217;s energy supply. As part of the \u201cEnergy Coast\u201d, the terminal is a central hub for feeding liquefied natural gas into the German supply network &#8211; and therefore an important building block for security of supply and energy independence. The requirements [&hellip;]","og_url":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal","og_site_name":"Holzhauer-Pumpen GmbH","article_publisher":"https:\/\/www.facebook.com\/holzhauerpumpen","article_modified_time":"2026-03-26T13:38:03+00:00","og_image":[{"width":1024,"height":575,"url":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-1024x575.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal","url":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal","name":"Fire protection for Energiek\u00fcste LNG terminal - Holzhauer-Pumpen GmbH","isPartOf":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal#primaryimage"},"image":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal#primaryimage"},"thumbnailUrl":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg","datePublished":"2025-07-09T08:40:27+00:00","dateModified":"2026-03-26T13:38:03+00:00","breadcrumb":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal#primaryimage","url":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg","contentUrl":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-content\/uploads\/sites\/2\/2025\/07\/aerial-view-tanker-ship-unloading-port-business-import-export-oil-with-tanker-ship-transportation-oil-from-refinery-sea-scaled.jpg","width":2560,"height":1438,"caption":"Aerial view tanker ship unloading at port, Business import export oil with tanker ship transportation oil from refinery on the sea."},{"@type":"BreadcrumbList","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/about-us\/reference-projects\/fire-protection-for-energiekuste-lng-terminal#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.holzhauer-pumpen.de\/en\/"},{"@type":"ListItem","position":2,"name":"Fire protection for Energiek\u00fcste LNG terminal"}]},{"@type":"WebSite","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#website","url":"https:\/\/www.holzhauer-pumpen.de\/en\/","name":"Holzhauer-Pumpen GmbH","description":"Fire protection. Since 1969.","publisher":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.holzhauer-pumpen.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#organization","name":"Holzhauer-Pumpen GmbH","url":"https:\/\/www.holzhauer-pumpen.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.holzhauer-pumpen.de\/wp-content\/uploads\/2020\/12\/placeholder.jpg","contentUrl":"https:\/\/www.holzhauer-pumpen.de\/wp-content\/uploads\/2020\/12\/placeholder.jpg","width":768,"height":454,"caption":"Holzhauer-Pumpen GmbH"},"image":{"@id":"https:\/\/www.holzhauer-pumpen.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/holzhauerpumpen","https:\/\/www.linkedin.com\/company\/holzhauer-pumpen\/mycompany\/","https:\/\/www.youtube.com\/channel\/UC4t3JItgraIywBYYI5Lm7xQ"]}]}},"_links":{"self":[{"href":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-json\/wp\/v2\/projects\/11876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-json\/wp\/v2\/media\/11878"}],"wp:attachment":[{"href":"https:\/\/www.holzhauer-pumpen.de\/en\/wp-json\/wp\/v2\/media?parent=11876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}