Booster Pump Units
- Engineered Products
- / Booster Pump Units
Booster Pump Units
The units are precisely matched, designed, built and tested for the respective project specifications, pumped media and application requirements.
Output range up to 1,500 mÂł/h.
Fully automatic pressure boosting systems for the supply of
- Hydrant systems
- Process water systems
- Fire-fighting water circuits
- Water supply systems
Different controls available for the operation of up to 5 pumps
- Conventional relay/contactor control
- Fully electronic control with PLC or FU or soft start with touch panel operation and system visualisation
The units are precisely matched, designed, built and tested for the respective project specifications, pumped media and application requirements. Acceptance tests on our own testing facility in accordance with all current national and international guidelines and standards are provided. Optionally, a control room connection via PROFIBUS® / PROFINET® or Ethernet interface is possible.
Possible versions
Flow rate 240 mÂł/h, delivery height 110 m
Use in the power plant as a combined hydrant / service water supply

Flow rate 520 mÂł/h, delivery height 90 m
Use in the power plant as a combined hydrant / service water supply

With electronic speed control, with different operating levels for extinguishing water and service water supply
Data bus connection to control room
Flow rate 800 mÂł/h, delivery head 120 m
Use in the power plant as a combined hydrant / service water supply

With electronic speed control, with different operating levels for extinguishing water and service water supply
Data bus connection to control room
Flow rate 320 mÂł/h, delivery head 85 m
Use in the power plant as a combined hydrant / service water supply
Applications
Reference Projects
Power Plants and Recycling
Fire protection for EnergiekĂĽste LNG terminal
Requirements The LNG terminal in northern Germany is a strategically important infrastructure project for Germany’s energy supply. As part of the “Energy Coast”, the…
Power Plants and Recycling
Fire protection for the dismantling of the nuclear power plant
Requirements Fire protection is a key issue when dismantling nuclear power plants. Our specially developed fire protection unit meets all safety-related requirements and is…
Retail
Stationary fire protection solution for Berlin shopping center
Requirements Shopping centers place complex demands on stationary fire protection systems. The aim of this project was to plan, manufacture, supply and install a…
Did you know …
We had already installed our company-owned QCTS Quality Control and Test System to ensure the highest product quality back in 1979.
Let us help you!
Our employees explain and illustrate the requirements of standards and regulations as early as the initial consultation phase and thus facilitate the implementation and safe application in your daily work. In addition, they present engineering expertise spanning 50 years of hands-on application and research and thus provide our customers with a decisive competitive edge.